The best way to understand what MacTrax can do is to see it in action. Our case studies showcase real projects delivered for real clients, each one presenting its own unique access, logistics, or recovery challenge in some of the UK's most demanding environments.

From recovering a 10-tonne dumper bogged on a remote construction site, to delivering a generator and fuel cube where no other contractor could get through, these projects reflect the problem-solving approach, specialist equipment, and professional standards that define everything we do at MacTrax.

T873 Cab Delivery

We delivered and installed a T873 cab at a remote telecoms site. Steep, muddy access ruled out conventional lifting equipment. Using tracked machinery, we transported the cab safely, providing an efficient solution to a challenging site operation.

Read more

10 Tonne dumper recovery

A 10-tonne tracked dumper bogged on a remote construction site, 150 miles from base — recovered safely on schedule using our Unimog and hydraulic winch, with the client back to work the same day.

Read more

Fuel bowser removal and replacement

Steep, rocky terrain and tight access ruled out conventional plant. Our tracked Avant 760 extracted the old bowser and installed a new 2000L bunded fuel cube with no ground damage and no disruption to refuelling operations.

Read more

Generator and fuel cube deployment

When the original contractor couldn't get through, MacTrax delivered a generator and fuel cube to a remote off-grid site across soft terrain and steep gradients, completing the job safely where others couldn't.